How your project runs

Know what happens next before the work starts.

A walkthrough first. Then a written scope, a written schedule and a price you can compare line by line. If the job changes, the paperwork changes before the work does.

01

Written scopeThe job on paper

02

Written scheduleThe sequence made visible

03

Written changesYour approval before extra work

The complete project path

Five stages. One written trail.

The purpose of the process is simple: you should be able to see what was agreed, what happens next and what changed without reconstructing the job from phone calls.

  1. 01

    At the house

    Walk the job with Jerome

    Start with the room, system or structure in front of us. We look at access, existing conditions and the result you are trying to reach before a number is attached to it.

  2. 02

    On paper

    Define the scope and price

    The written scope names the work, materials, exclusions and responsibilities. The estimate belongs to that scope, so competing quotes can be compared on more than the bottom line.

  3. 03

    Before the build

    Set the schedule and permit path

    The work is put in sequence. When permits are required, they are pulled in the licensed name and the inspections are scheduled around the stages they approve.

  4. 04

    During construction

    Build against the written scope

    The scope and schedule remain the reference point. Material arrivals, inspections and discoveries can affect a working day, but they should never become unexplained changes.

  5. ✓

    At completion

    Walk the finished work

    The last stage is a walkthrough against the agreed work, completion of the remaining items and the final inspection where the permitted scope requires one.

The written scope

A quote is a number. A scope is the job.

A low number is not useful if it leaves out demolition, disposal, finish repair or the material you thought was included. The scope is where those assumptions become line items.

Read it beside every estimate you collect. If two scopes are different, the prices are not describing the same job.

Read the project FAQ

Scope of work

Review before signing
Work included

The rooms, systems and tasks covered by the price.

Materials and finishes

Named products, allowances and who supplies each item.

Exclusions

What is not part of the quote, stated before work begins.

Sequence and access

The order of work and what the crew needs from the house.

Permits and inspections

Which approvals apply and who is responsible for them.

Price and changes

The agreed number and the written path for changing it.

When the house changes the plan

If something changes, the paper changes first.

Older homes hide things. Water damage, a failed subfloor or framing that does not match the drawing is not unusual. A surprise condition should not become a surprise invoice.

  1. 01

    We stop and show you.

    You see the condition in a photo, a video or at the job before extra work begins. You do not receive a charge for something you were never shown.

  2. 02

    You get the cost in writing.

    The change order explains what was found, what the added work costs and what it does to the finish date in plain language.

  3. 03

    Nothing extra starts until you approve it.

    No additional work begins without written approval. You can ask questions, seek another opinion or choose another path before deciding.

  4. 04

    The schedule changes with the scope.

    If the added work requires more time, that time is stated with the change instead of appearing later as an unexplained delay.

  5. 05

    The original scope does not quietly move.

    The signed scope remains the baseline. Only written changes you approve alter that scope, and you receive a copy of each one.

Permits and inspections

The permit belongs in the plan, not in the fine print.

Not every repair follows the same permit path. The address, jurisdiction and scope decide what applies. When a permit is required, it is pulled in the licensed name and the inspections are scheduled at the stages the building department needs to see.

California Class BCSLB #1105333 Verify
  1. Plan

    Scope and drawings

    Confirm the work the jurisdiction needs to review.

  2. Permit

    Approval before the covered work

    The issued permit becomes part of the job record.

  3. Inspect

    Stage inspections

    Required work stays visible until the inspector signs off on that stage.

  4. Close

    Final sign-off

    The permitted scope closes with the required final inspection.

Schedule visibility

A quiet day should not be a mystery.

Construction is not only the time a tool is running. Permit review, inspections, material lead times and approved changes can sit on the critical path too. The written schedule should make those dependencies visible.

W

Working day

Demolition, rough work, installation or finish work is scheduled on site.

I

Inspection day

A covered stage pauses until the required inspection is complete.

M

Material or plan hold

The next stage depends on an approved plan, ordered item or confirmed delivery.

C

Change-order day

The schedule is updated when an approved change adds work or alters the sequence.

Before you choose a contractor

Put these questions beside every quote.

A useful estimate should survive specific questions. Ask the same ones of every contractor so you can compare the process as carefully as the price.

Bring us your project
  • 01

    Is the complete scope itemized in writing?

  • 02

    Which materials, repairs and disposal costs are included?

  • 03

    Who pulls the permit, and under whose license?

  • 04

    What requires a written change order?

  • 05

    How does a scope change affect the schedule?

  • 06

    What is specifically excluded from the price?